Client:
Eurotunnel le Shuttle
|
Location:
Folkestone, Kent
After an initial onsite consultation, our highly skilled design team set to work creating a bespoke solution to meet the air conditioning and ventilation needs of the terminals’ varying facilities. Managed by Orbital’s Contracts Director and conducted onsite by Orbital’s Engineering Team, the installation was implemented in two phases over a four-month period.
Both Split and Multi-Split Systems were commissioned and installed. At every single stage, the Orbital team worked carefully to SEC’s project schedule specifications, paying attention to detail and ensuring agreed timeframes were met along the way.
Upon completion, a full handover was delivered by Orbital, and at this time, full user training was provided as well as an extensive ‘Operation & Maintenance (O&M) Manual’.